Fibre optics & OPGW

OPGW and fibre networks for projects in Argentina

OPGW and ADSS installation, backbone networks and FTTH/FTTx rollout, with fibre splicing and testing. Based in San Juan, we assess scope, resources and mobilisation for each project in Argentina.

Scope, resources, qualifications and schedule are confirmed following technical review of the project.

Request an OPGW scope review
Standard
IEC 60794-4
Fibre
OS2 · 1310 / 1550 nm
Configuration
48F · 96F · 288F
Working altitude
assessed per site

OPGW is not a communications cable hung from a tower: it is the line's ground wire, and it fails as a ground wire. We quote and build on that basis — reel plan, per-point fibre allocation matrix and span table before the first pull.

01

Optical ground wire (OPGW)

OPGW stringing on transmission lines, with suspension and tension hardware, dampers, down-leads to chambers and slack storage on crossarms.

  • 48F to 288F configurations
  • Suspension, tension and damping hardware
  • Galvanised conduit down-leads with rodent-resistant fibre
  • Slack storage at project-defined height
02

Backbone and ADSS

Intercity aerial and underground backbones, ducting, splice chambers and special crossings.

  • Route survey, staking and crossing permits
  • Multiport closures at branch points
  • Chambers and civil-works ducting
03

FTTH / FTTx

Access networks at scale: feeder, distribution, NAPs, drops and service turn-up under carrier SLA.

  • ODF, NAP and OLT installation
  • Per-fibre certification and as-built drawings
  • Documented FTTH work since March 2026
04

Splicing and certification

Arc fusion, bidirectional OTDR and power meter. Closures are pressure-sealed: the fibre matrix is defined before, not after.

  • Per-point fibre allocation matrix
  • Bidirectional OTDR 1310 / 1550 nm
  • Measurement dossier per section and per fibre

Next step

Share the inputs for an OPGW scope review.

Include the location and route length, cable type and fibre count, available technical documentation and target schedule. We review missing information, scope, resources and mobilisation before agreeing next steps.

Corporate, tax, HSE and integrity documentation for supplier prequalification.