3DELECTRO SAN JUAN 3DELECTRO SAN JUAN
Hero cinematic — 3DELECTRO

Industries

Four sectors, one shared requirement: it must not fail.

The tender, the HSE standard and the contract form change. What is expected of the installation does not.

Scope, resources, qualifications and schedule are confirmed following technical review of the project.

Mining
01 — Andes · process plants · camps

Mining

Electrical and communications infrastructure proposals for mining. Altitude, weather, access, resources and operator requirements are assessed before scope is confirmed.

Energy
02 — Generation · transmission · distribution

Energy

Substations, electrical rooms, MV/LV, telemetry and optical ground wire installation on transmission lines are assessed against applicable professional expertise, resources and qualifications. Testing and drawings are agreed per project.

Telecommunications
03 — Mass FTTH · backbone · carrier SLA

Telecommunications

Access network deployment and backbone routing. The offer defines work fronts, measurements, acceptance and close-out documentation.

Industry and public works
04 — Tenders · joint ventures · framework contracts

Industry and public works

Field support for automation, instrumentation and electromechanical assembly, subject to engineering, resources and a technical partner where required. Participation and close-out requirements are verified for each process.

Next step

Request our qualification dossier.

Corporate, tax, HSE and integrity documentation, packaged for vendor pre-qualification. We review your scope and coordinate the next steps.