3DELECTRO SAN JUAN 3DELECTRO SAN JUAN

San Juan · Argentina · Operating 2026

Where it fails,
there is no second visit.

We build electrical and fibre optic infrastructure in the Andes, on assets that cannot absorb unplanned downtime. Engineering, procurement and installation under a single contract.

Site altitude
4,420 m.a.s.l.
Minimum temperature
−23 °C
Design wind
257 km/h
Short circuit
40 kA
Fibre standard
IEC 60794-4
6
Consecutive months of certified production on an FTTH contract (Feb–Jul 2026)
22
Management and integrity documents signed by the Board (14 Aug 2026)
4420 m
Maximum accredited working altitude in the Andes
48–72 h
Effective mobilisation to any province in the country

Method

A pressure-sealed splice is not reopened to correct an allocation error. That is why we define the fibre matrix before the first metre of cable is pulled.

Qualification

What a procurement team needs to see before inviting us.

Mining Tax Registry

Category 209 — Suppliers to Mining Companies. Tax ID 30-71864271-6.

Integrated Management System

22 documents signed and approved by the Board on 14 Aug 2026, aligned to ISO 9001, 14001 and 45001.

Integrity channel

Whistleblowing, investigation and non-retaliation procedure with a dedicated channel: interno@3delectrosanjuan.com

Appointed HSE lead

Licensed professional formally appointed by institutional minute, current CPHST registration. Full details in the qualification dossier.

San Juan state supplier registry

RUPE certificate No. 80405.

Corporate structure

Registered S.R.L., eligible for public tenders, joint ventures and framework contracts.

Field

Technical fronts where the team operates, measures and documents.

Sitio operativo en montaña con torre y sistema solar
SITIO 01
Autonomous high-altitude site
Container, tower and solar generation
Hidrogrúa en operación de izaje
SITIO 02
Risk-4 certified lifting
Structure assembly
Medición OTDR sobre fibra empalmada
SITIO 03
OTDR certification
Per-fibre measurement
Mantenimiento de radioenlace en torre
SITIO 04
Radio link
Maintenance
Tendido subterráneo de fibra en zona urbana
SITIO 05
Underground routing
Ducting and splicing
Sitio remoto con energía autónoma
SITIO 06
Remote operation
Power and communications

How we work

From tender documents to certified handover.

  1. 01

    Assessment

    Acknowledged within 4 business hours. Technical review of tender documents or on site, at no cost.

  2. 02

    Engineering and take-off

    Scope, quantity take-off, reel plan and schedule. Deviations between the tender and inherited scope are raised in writing, not assumed.

  3. 03

    Procurement

    Direct import or coordinated purchase, with the approved brand agreed in writing before the order is placed.

  4. 04

    Execution

    Crews mobilised within 48–72 hours, under work permit, risk analysis and lock-out procedure.

  5. 05

    Certification and closure

    Measurements, testing, as-built drawings and a complete documentary dossier.

Frequently asked questions

What we get asked before being invited to bid.

What is an OPGW cable and how does it differ from ADSS?

OPGW is the earth wire of a high-voltage line with optical fibre in its core: it performs the electrical protection function against lightning and also carries data. ADSS is a self-supporting dielectric cable installed alongside the line with no electrical function. They are sized and installed differently: OPGW requires verification of short-circuit current, I²t, span tables and shielding angle.

What altitude can your crews work at?

We have accredited operation up to 4,420 metres above sea level, with design parameters of −23 °C, 257 km/h wind and 660 kgf/m² snow load. Altitude constrains crew productivity, the working window and access logistics, and that is reflected in the schedule from the quotation stage.

Do you work as main contractor or as a subcontractor?

Both. We deliver turnkey work with engineering, procurement and installation under a single contract, and we also subcontract for main contractors and EPCs with complete documentary closure. Our corporate structure also allows forming a joint venture where the process requires it.

How quickly can you mobilise a crew?

Within 48 to 72 hours to any province in Argentina. Our operating base is in Rivadavia, San Juan, with logistics support in Bahía Blanca, Buenos Aires.

Are you certified to ISO 9001, 14001 and 45001?

We are not certified. We run an Integrated Management System implemented against those three standards, with 22 governance, integrity, HSE, environmental and quality documents signed and approved by the Board on 14 August 2026, and internal audit scheduled for Q4 2026. We prefer to state it precisely.

What documentation do you hand over at project closure?

Measurements and testing according to the work type, as-built drawings and the complete documentary dossier. For fibre: bidirectional OTDR certification per fibre and a per-point fibre allocation matrix. For electrical work: dielectric and continuity testing, earth resistance measurement and as-built single-line diagrams.

Are you registered as a mining supplier?

Yes. We are listed in the Argentine Mining Activity Tax Registry, Category 209 — Suppliers to Mining Companies, under tax ID 30-71864271-6, and in the San Juan state supplier registry (RUPE) under certificate No. 80405.

Next step

Request our qualification dossier.

Corporate, tax, HSE and integrity documentation, packaged for vendor pre-qualification. Acknowledged within 4 business hours.