San Juan · Argentina · Operating 2026
Where it fails,
there is no second visit.
We build electrical and fibre optic infrastructure in the Andes, on assets that cannot absorb unplanned downtime. Engineering, procurement and installation under a single contract.
Capabilities
Four technical fronts, one contractual responsibility.
Design, supply and installation under a single contract. The client has one counterpart and one responsible party, not a chain of suppliers.
Fibre optics, OPGW and ADSS on high-voltage lines
Optical ground wire installation on transmission lines, backbone networks and FTTH/FTTx rollout. Fusion splicing and per-fibre certification.
View serviceMedium and low voltage electrical works
Substations, electrical rooms, switchboards, earthing systems and electromechanical assembly, with certified testing and as-built drawings on every handover.
View serviceTelecommunications, towers and work at height
Radio links, antennas, autonomous remote sites and height infrastructure maintenance, with certified crews.
View serviceIndustrial automation and SCADA
Process control, telemetry and instrumentation for plants, pumping stations and auxiliary services.
View service
Method
A pressure-sealed splice is not reopened to correct an allocation error. That is why we define the fibre matrix before the first metre of cable is pulled.
Qualification
What a procurement team needs to see before inviting us.
Mining Tax Registry
Category 209 — Suppliers to Mining Companies. Tax ID 30-71864271-6.
Integrated Management System
22 documents signed and approved by the Board on 14 Aug 2026, aligned to ISO 9001, 14001 and 45001.
Integrity channel
Whistleblowing, investigation and non-retaliation procedure with a dedicated channel: interno@3delectrosanjuan.com
Appointed HSE lead
Licensed professional formally appointed by institutional minute, current CPHST registration. Full details in the qualification dossier.
San Juan state supplier registry
RUPE certificate No. 80405.
Corporate structure
Registered S.R.L., eligible for public tenders, joint ventures and framework contracts.
Field
Technical fronts where the team operates, measures and documents.






How we work
From tender documents to certified handover.
- 01
Assessment
Acknowledged within 4 business hours. Technical review of tender documents or on site, at no cost.
- 02
Engineering and take-off
Scope, quantity take-off, reel plan and schedule. Deviations between the tender and inherited scope are raised in writing, not assumed.
- 03
Procurement
Direct import or coordinated purchase, with the approved brand agreed in writing before the order is placed.
- 04
Execution
Crews mobilised within 48–72 hours, under work permit, risk analysis and lock-out procedure.
- 05
Certification and closure
Measurements, testing, as-built drawings and a complete documentary dossier.
Frequently asked questions
What we get asked before being invited to bid.
What is an OPGW cable and how does it differ from ADSS?
OPGW is the earth wire of a high-voltage line with optical fibre in its core: it performs the electrical protection function against lightning and also carries data. ADSS is a self-supporting dielectric cable installed alongside the line with no electrical function. They are sized and installed differently: OPGW requires verification of short-circuit current, I²t, span tables and shielding angle.
What altitude can your crews work at?
We have accredited operation up to 4,420 metres above sea level, with design parameters of −23 °C, 257 km/h wind and 660 kgf/m² snow load. Altitude constrains crew productivity, the working window and access logistics, and that is reflected in the schedule from the quotation stage.
Do you work as main contractor or as a subcontractor?
Both. We deliver turnkey work with engineering, procurement and installation under a single contract, and we also subcontract for main contractors and EPCs with complete documentary closure. Our corporate structure also allows forming a joint venture where the process requires it.
How quickly can you mobilise a crew?
Within 48 to 72 hours to any province in Argentina. Our operating base is in Rivadavia, San Juan, with logistics support in Bahía Blanca, Buenos Aires.
Are you certified to ISO 9001, 14001 and 45001?
We are not certified. We run an Integrated Management System implemented against those three standards, with 22 governance, integrity, HSE, environmental and quality documents signed and approved by the Board on 14 August 2026, and internal audit scheduled for Q4 2026. We prefer to state it precisely.
What documentation do you hand over at project closure?
Measurements and testing according to the work type, as-built drawings and the complete documentary dossier. For fibre: bidirectional OTDR certification per fibre and a per-point fibre allocation matrix. For electrical work: dielectric and continuity testing, earth resistance measurement and as-built single-line diagrams.
Are you registered as a mining supplier?
Yes. We are listed in the Argentine Mining Activity Tax Registry, Category 209 — Suppliers to Mining Companies, under tax ID 30-71864271-6, and in the San Juan state supplier registry (RUPE) under certificate No. 80405.
Next step
Request our qualification dossier.
Corporate, tax, HSE and integrity documentation, packaged for vendor pre-qualification. Acknowledged within 4 business hours.