Industrial SCADA and telemetry control centre

Automation · supervision

SCADA, telemetry and field-system integration

We assess signal, panel, instrumentation, communications and supervision integration. Interfaces, system access, competence and acceptance tests are defined before implementation is committed.

Scope, resources, qualifications and schedule are confirmed following technical review of the project.

Scope
Field · control · communications
Systems
PLC · HMI · SCADA · RTU
Testing
FAT · SAT · commissioning
Industries
Mining · energy · process

Scope and decisions

A SCADA system is reliable when a signal can be traced from the process to the screen.

Quality is not software alone. It requires instruments, I/O, panels, power, networks, protocols, addressing, alarms, historians, cybersecurity, testing and records to be coordinated.

01

Field and instrumentation

Survey, installation, connection and verification of instruments, actuators, signals and loops.

  • I/O list
  • Loop checks
  • Calibration by scope
02

Control and supervision

PLC, RTU, HMI and SCADA architecture, naming, alarms, history and permissions.

  • Cause-and-effect matrix
  • Screens and alarms
  • Backups and versions
03

Communications and integration

Fibre, radio, industrial Ethernet, protocols and gateways connecting field, control and upper levels.

  • Topology and addressing
  • Redundancy
  • End-to-end tests

Method

Work sequence

01

Functional survey

We define process, signals, equipment, current architecture, issues and acceptance criteria.

02

Engineering

We close I/O, networks, protocols, panels, power, alarms, history and responsibilities.

03

Development and integration

We configure equipment and platforms within scope, controlling versions and changes.

04

FAT

We test logic, screens, communications, alarms and simulated cases before field work.

05

SAT and commissioning

We verify loops, sequences, data, redundancy and operation against the live process.

06

Handover

We transfer backups, matrices, manuals, protocols, training and dossier.

Required inputs

Information required to quote without hidden assumptions

Correct inputs turn a general requirement into an executable, measurable and quotable scope.

  • Functional description and operating philosophy
  • P&ID, I/O list and cause-and-effect
  • Existing PLC, RTU, HMI and SCADA
  • Protocols, topology and addressing
  • Instruments, ranges, signals and power
  • Alarms, priorities, history and reports
  • Redundancy, availability and time synchronisation
  • Users, permissions and cybersecurity requirements
  • FAT, SAT, loop checks and acceptance criteria
  • Backups, licences, manuals and intellectual property

Commercial engineering

What drives price and schedule

01

Signal count and quality

I/O, loops, instrumentation and existing records define engineering and test hours.

02

Legacy-system integration

Protocols, licences, versions and authorised code access determine complexity and risk.

03

Test availability

Shutdowns, simulation, operations and third-party coordination affect FAT, SAT and commissioning.

04

Redundancy and cybersecurity

Servers, networks, firewalls, backup, permissions and continuity expand architecture and validation.

Acceptance

Deliverables and close-out documentation

The package is complete when the technical result and the supporting records can be accepted.

  • Control and communication architecture
  • I/O, addressing and alarm lists
  • FAT, SAT and loop-check protocols
  • Backups and version control
  • Manuals and training by scope
  • Drawings, matrices and final dossier

Frequently asked questions

Questions that change scope, price or acceptance.

Can different brands be integrated?

Yes, subject to protocols, documentation, licences, versions and authorised configuration access.

Can you modify an operating legacy system?

Yes. We first create backups, inventory versions, define risks and prepare a rollback plan.

Can instrumentation be included?

Yes, including supply, installation, connection, calibration and loop checks within defined scope.

What is handed over?

Backups, matrices, architecture, addressing, test protocols, manuals, redlines and dossier according to scope.

Next step

Send the architecture, I/O and operating issue.

State process, equipment, protocols, signals, target date and FAT/SAT criteria. We return a scope and interface matrix.