3DELECTRO SAN JUAN 3DELECTRO SAN JUAN
Fiber racks — 3DELECTRO

Automation & SCADA

SCADA and telemetry for projects in Argentina

Process control, telemetry and instrumentation for plants, pumping stations and auxiliary services. Based in San Juan, we review system interfaces, scope, resources and mobilisation for each project in Argentina.

Scope, resources, qualifications and schedule are confirmed following technical review of the project.

Discuss your SCADA requirements
Platforms
PLC · HMI · SCADA
Link
Fibre · radio · satellite
Deliverable
Documented logic + backups
Integration
Legacy system migration

A control system without documentation is a system nobody can maintain once the programmer leaves. We hand over documented logic, backups and an operating manual.

01

Process control

PLC and HMI for process plants, pumping stations and auxiliary services.

  • Programming and commissioning
  • Operator screens and alarms
  • Backups and logic versioning
02

Telemetry and SCADA

Centralised supervision of distributed assets, linked by fibre, radio or satellite.

  • Variable acquisition and logging
  • Reports and trends
  • Integration with existing assets
03

Instrumentation

Pressure, flow, temperature and level measurement; variable speed drives and soft starters.

  • Instrument selection and mounting
  • On-site calibration and verification
  • Documented loops

Next step

Define the scope of your SCADA requirements.

Describe the process and assets, existing communications, system interfaces and required deliverables. Include available architecture or I/O documentation and the target schedule so that we can review requirements and responsibilities before agreeing a scope.

Corporate, tax, HSE and integrity documentation for supplier prequalification.